Identity Functions Update #2
The first week of shooting is finished, with four out of seven scenes shot.
Progress reports generated by my production management system Thalia:
Overall production progress bar
Production progress broken down by scene
(Thalia keeps a record for each scene in a production, including notes on cast, crew, location, wardrobe, properties and the partially marked-up script. I can then print out the entire script, or just the script for individual scenes along with a breakout sheet. Each filming session is entered by scene, along with a rough percentage completed. This can then be used to dynamically generate the above completeness graphs.)
Tuesday night was
cria_cow and
datavore outside the new business school building on campus. Saturday and Sunday nights were
datavore and
vixyish at
cria_cow's radically re-arranged apartment.
All that is left is the fairly meaty scene 7 and the two montage scenes 2 and 3. These will probably be done next weekend.
Progress reports generated by my production management system Thalia:
Overall production progress bar
Production progress broken down by scene
(Thalia keeps a record for each scene in a production, including notes on cast, crew, location, wardrobe, properties and the partially marked-up script. I can then print out the entire script, or just the script for individual scenes along with a breakout sheet. Each filming session is entered by scene, along with a rough percentage completed. This can then be used to dynamically generate the above completeness graphs.)
Tuesday night was
All that is left is the fairly meaty scene 7 and the two montage scenes 2 and 3. These will probably be done next weekend.
